Bathroom Renovation
bathroom renovation scoped, priced and scheduled properly โ materials, trades and timeline agreed in writing before the first day on site.
Starting From
AED 2999
per service
About This Service
Bathroom renovation includes fixture removal, waterproof membrane application (critical for UAE's warm climate), wall and floor tiling, shower enclosure or bathtub installation, vanity and mirror fitting, toilet replacement, plumbing connections, exhaust fan installation, and lighting upgrade. We handle the complete demolition-to-handover process. Standard bathroom renovation takes 5-10 days depending on scope.
Renovation work in UAE towers usually needs building management approval, a works permit and agreed working hours. We prepare that paperwork as part of the job, because a permit refused on day one costs far more than the fortnight it takes to arrange.
What's Included
Our Process
Site visit to survey the space and discuss what you want
We issue an itemised quote with materials, labour and timeline
Building approvals and works permits are arranged
Work starts on the agreed date with a site supervisor assigned
You get progress updates and sign off each completed stage
Final handover with snag list and debris removal
Service Areas โ Available Across the UAE
Our bathroom renovation service is available in all seven emirates. Select your location to check availability.
Frequently Asked Questions
What does bathroom renovation cost in the UAE?
Bathroom Renovation starts from AED 2999. That is a starting rate, not a cap โ the final figure depends on property size, the condition of what we are working on, and the actual scope once our technician has seen it. You get the confirmed price before any work begins, and nothing is added afterwards.
What happens if we find defects after handover?
Handover includes a joint snag walkthrough where anything outstanding is listed and fixed. Workmanship is covered by warranty after that, so defects that appear later are our responsibility to put right.
How long does bathroom renovation take?
A bathroom refresh is typically 1-2 weeks, a kitchen 2-4 weeks, and a full apartment fit-out 6-12 weeks. The written timeline in your quote accounts for material lead times and permit approval, which are the two things that most often move dates.
How do I book bathroom renovation?
Pick a slot on the booking page, request a quote, or message us on WhatsApp with your building name and preferred time. We confirm bathroom renovation bookings within minutes during working hours and tell you the technician's arrival window rather than a vague half-day slot.
Which emirates do you cover for bathroom renovation?
All seven โ Dubai, Sharjah, Abu Dhabi, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain, plus Al Ain. Teams are based locally, so bathroom renovation in Dubai and Sharjah usually gets a same-day slot while the outer emirates are typically next day.
Can I get bathroom renovation outside normal working hours?
Yes. Early morning, evening and weekend slots are available, which most customers booking bathroom renovation prefer over taking time off work. Friday mornings are the one window we generally cannot cover.