Tiling
tiling scoped, priced and scheduled properly โ materials, trades and timeline agreed in writing before the first day on site.
Starting From
AED 299
per service
About This Service
Tile installation covers floor and wall tiling in bathrooms, kitchens, balconies, and living areas. Our tilers handle surface preparation, waterproof membrane application (for wet areas), adhesive application, tile laying with consistent spacer gaps, grouting, and edge trim finishing. We work with all tile types โ ceramic, porcelain, natural stone, large-format, mosaic, and patterned tiles. Rate is per square meter, with cutouts for outlets and fixtures included.
Renovation work in UAE towers usually needs building management approval, a works permit and agreed working hours. We prepare that paperwork as part of the job, because a permit refused on day one costs far more than the fortnight it takes to arrange.
What's Included
Our Process
Site visit to survey the space and discuss what you want
We issue an itemised quote with materials, labour and timeline
Building approvals and works permits are arranged
Work starts on the agreed date with a site supervisor assigned
You get progress updates and sign off each completed stage
Final handover with snag list and debris removal
Service Areas โ Available Across the UAE
Our tiling service is available in all seven emirates. Select your location to check availability.
Frequently Asked Questions
What does tiling cost in the UAE?
Tiling starts from AED 299. That is a starting rate, not a cap โ the final figure depends on property size, the condition of what we are working on, and the actual scope once our technician has seen it. You get the confirmed price before any work begins, and nothing is added afterwards.
Is the quote fixed or does it change?
The quote is fixed against the agreed scope. Costs only move if you change the scope or if something genuinely unforeseen turns up behind a wall โ and in that case you get a written variation to approve before we proceed.
Can we stay in the property during the work?
For single-room work, usually yes โ we seal the work area and keep dust contained. For full fit-outs involving water and power shutdowns, most customers move out. We will give you an honest view for your specific job at the survey.
How do I pay for tiling?
Payment is taken after tiling is finished and you have checked the work โ cash, card on the technician's terminal, or bank transfer. Nothing is charged upfront, and there is no deposit for standard bookings.
How do I book tiling?
Pick a slot on the booking page, request a quote, or message us on WhatsApp with your building name and preferred time. We confirm tiling bookings within minutes during working hours and tell you the technician's arrival window rather than a vague half-day slot.
Which emirates do you cover for tiling?
All seven โ Dubai, Sharjah, Abu Dhabi, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain, plus Al Ain. Teams are based locally, so tiling in Dubai and Sharjah usually gets a same-day slot while the outer emirates are typically next day.